Management System Optimization Solution for Companies with Over 10,000 Employees
Management System Optimization Solution for Companies with Over 10,000 Employees
A management system optimization solution for a global aluminum manufacturing company with over 10,000 employees. The solutions help enhance performance, improve workflows, and achieve high efficiency across all departments of the company through the optimization of the management system.
Learn More
Automated Glove Production Line at Long Thanh Industrial Park: Quick Solution to Ensure Production Progress
Automated Glove Production Line at Long Thanh Industrial Park: Quick Solution to Ensure Production Progress
Explore the solution for installing and operating the automated glove production line at Long Thanh Industrial Park, ensuring production progress without the need for Chinese experts. Learn about the process and results in this article.
Learn More
Installation of New Control System to Boost Production Line Efficiency – Optimizing Production Processes
Installation of New Control System to Boost Production Line Efficiency – Optimizing Production Processes
Installation of a new control system for the production line at Long Thanh Industrial Park, optimizing processes and increasing productivity. IDEA Group provides an effective solution to improve production operations.
Learn More
Efficient Electrical Cabinet Installation and Expert System Maintenance at Thuan An Factory, Binh Duong
Efficient Electrical Cabinet Installation and Expert System Maintenance at Thuan An Factory, Binh Duong
The newly imported production lines from abroad (Italy, Germany, etc.) come with significantly higher costs for hiring foreign workers. The solution of employing engineers in Vietnam for Electrical Cabinet Installation, connecting peripheral devices, performing operation tests, and carrying out regular maintenance not only helps reduce costs but also ensures a readily available workforce in case of any issues at the Thuan An factory in Binh Duong.
Learn More
Efficient Installation of Vulcanization Machines, Expert Equipment Replacement, and Optimized Controller Reprogramming at Phu Giao Factory
Efficient Installation of Vulcanization Machines, Expert Equipment Replacement, and Optimized Controller Reprogramming at Phu Giao Factory
Due to the limited budget, the factory cannot afford to purchase new, modern vulcanization machines and has opted to use still-functional second-hand machines. The investor's goal is to ensure the machines work effectively as soon as possible for production.
Learn More
Medium-Voltage Drive Repair – Solutions for Board Burnout and PLC Module Damage
Medium-Voltage Drive Repair – Solutions for Board Burnout and PLC Module Damage
IDEA Group provides a comprehensive Medium-Voltage Drive Repair solution, addressing burnt drive boards at the pump station, resolving PLC module damage, and installing overvoltage protection devices to ensure stable and reliable system performance.
Learn More